Commitments to unrealistic time and resource estimates may result in ??
A. project delay
B. poor quality work
C. project failure
D. all of the mentioned
D. all of the mentioned
Which paradigm structures a team loosely and depends on individual initiative of the team members ??
A. random paradigm
B. open paradigm
C. closed paradigm
D. synchronous paradigm
D. synchronous paradigm
Which paradigm relies on the natural compartmentalization of a problem and organizes team members to work on pieces of the problem with little active communication among themselves ??
A. random paradigm
B. open paradigm
C. closed paradigm
D. synchronous paradigm
C. closed paradigm
Which of the following is a people-intensive activity ??
A. Problem solving
B. Organization
C. Motivation
D. Project management
D. Project management
Which of the following term is best defined by the statement: The degree of uncertainty that the product will meet its requirements and be fit for its intended use ??
A. Performance risk
B. Cost risk
C. Support risk
D. Schedule risk
A. Performance risk
Which of the following term is best defined by the statement: There will be a change of organizational management with different priorities ??
A. Staff turnover
B. Technology change
C. Management change
D. Product competition
C. Management change
Software Management Quiz
If an Indirect approach is taken, then the sizing approach is represented as ??
A. LOC
B. FP
C. Fuzzy Logic
D. LOC and FP
B. FP
The expected value for the estimation variable (size), S, can be computed as a weighted average of the optimistic(Sopt), most likely (Sm), and pessimistic (Spess) estimates given as ??
A. EV = (Sopt + 4Sm + Spess)/4
B. EV = (Sopt + 4Sm + Spess)/6
C. EV = (Sopt + 2Sm + Spess)/6
D. EV = (Sopt + 2Sm + Spess)/4
B. EV = (Sopt + 4Sm + Spess)/6
If a Direct approach to software project sizing is taken, size can be measured in ??
A. LOC
B. FP
C. LOC and FP
D. None of the mentioned
A. LOC
How many forms exists of Barry Boehm’s COCOMO Model ??
A. Two
B. Three
C. Four
D. No form exists
B. Three
Which risks are associated with the overall size of the software to be built or modified ??
A. Business impact risks
B. Process definition risks
C. Product size risks
D. Development environment risks
C. Product size risks
Why is decomposition technique required ??
A. Software project estimation is a form of problem solving
B. Developing a cost and effort estimate for a software project is too complex
C. All of the mentioned
D. None of the mentioned
C. All of the mentioned
Software Management Quiz
What is the product of the probability of incurring a loss due to the risk and the potential magnitude of that loss ??
A. Risk exposure
B. Risk prioritization
C. Risk analysis
D. All of the mentioned
A. Risk exposure
Which model is used during early stages of the system design after the requirements have been established ??
A. An application-composition model
B. A post-architecture model
C. A reuse model
D. An early design model
D. An early design model
Which of the following uses empirically derived formulas to predict effort as a function of LOC or FP ??
A. FP-Based Estimation
B. Process-Based Estimation
C. COCOMO
D. Both FP-Based Estimation and COCOMO
D. Both FP-Based Estimation and COCOMO
Which model is used to compute the effort required to integrate reusable components or program code that is automatically generated by design or program translation tools ??
A. An application-composition model
B. A post-architecture model
C. A reuse model
D. An early design model
C. A reuse model
Which version of COCOMO states that once requirements have been stabilized, the basic software architecture has been established ??
A. Early design stage model
B. Post-architecture-stage model
C. Application composition model
D. All of the mentioned
A. Early design stage model
Which of the following states that work expands to fill the time available ??
A. CASE tools
B. Pricing to win
C. Parkinson’s Law
D. Expert judgement
C. Parkinson’s Law
Software Management Quiz
Which model was used during the early stages of software engineering, when prototyping of user interfaces, consideration of software and system interaction, assessment of performance, and evaluation of technology maturity were paramount ??
A. Early design stage model
B. Post-architecture-stage model
C. Application composition model
D. All of the mentioned
C. Application composition model
Which technique is applicable when other projects in the same analogy application domain have been completed ??
A. Algorithmic cost modelling
B. Expert judgement
C. Estimation by analogy
D. Parkinson’s Law
C. Estimation by analogy
A _______________ is developed using historical cost information that relates some software metric to the project cost ??
A. Algorithmic cost modelling
B. Expert judgement
C. Estimation by analogy
D. Parkinson’s Law
A. Algorithmic cost modelling
A number of independent investigators have developed a team-oriented approach to requirements gathering that can be applied to establish the scope of a project called ??
A. JAD
B. CLASS
C. FAST
D. None of the mentioned
C. FAST
CLSS stands for ??
A. conveyor line sorting system
B. conveyor line sorting software
C. conveyor line sorting speed
D. conveyor line sorting specification
A. conveyor line sorting system
Which of the following is an important factor that can affect the accuracy and efficacy of estimates ??
A. Project size
B. Planning process
C. Project complexity
D. Degree of structural uncertainty
A. Project size
Software Management Quiz
What can be used to complement decomposition techniques and offer a potentially valuable estimation approach in their own right ??
A. Automated estimation tools
B. Empirical estimation models
C. Decomposition techniques
D. Both Automated estimation tools and Empirical estimation models
B. Empirical estimation models
Which of the following is not an option to achieve reliable cost and effort estimate ??
A. Base estimates on similar projects that have already been completed
B. Use one or more empirical models for software cost and effort estimation
C. Use relatively simple decomposition techniques to generate project cost and effort estimates
D. The ability to translate the size estimate into human effort, calendar time, and dollars
D. The ability to translate the size estimate into human effort, calendar time, and dollars